Demolition complete, construction begins
September 27, 2017Wonderland Corsets
October 22, 2018Construction update
The last week has seen a lot of progress on both office and set construction. Unfortunately the hectic schedule has kept me from posting more about the progress. This post will serve as a quick update as to our progress. Most of these images are from late last week so we are actually further along than these images show. We are hoping to be 90% done or better for the soft opening this weekend with our Open House event and Dia de los Muertos fundraiser.
The image to the right shows the future gallery wall where we will be hanging images shot in the studio along with credits for easy collaboration and networking.
Break time!
Even though things have been very busy and hectic around the studio we have found time to goof off, have a little fun and take a few well deserved deep breaths. The tub set will start off as a dry set but we are working hard on getting the ability to fill and drain the tub. Early November this set will be fillable with water.
Branding and logos
With things starting to move into the final stages we have gotten our logos and signs up on the building. Seeing our name go up on the doors was a fantastic moment. It really made the space feel more like ours.